When the GSE has incorrect production data

Real problems of renewable energy producers, solved by ACEPER and its specialist members: how we stepped in, which checks we carried out and what results the member achieved.

The problem

This solar battery storage project was designed to improve energy independence and make better use of renewable power. The system stores excess solar energy during the day and provides dependable power when solar production is low.

With efficient equipment and smart energy management, the project helps reduce grid dependency while providing greater control over daily energy usage.

What we did

We noticed it when we gave him access to our software, which monitors plant production and shows it in easy-to-read charts. An anomaly stood out immediately: the 2017 production calculated by e-distribuzione was much higher than the figure the GSE had used to calculate incentives, a difference of about 20,000 kWh.

  • Production monitoring
  • e-distribuzione vs GSE data check
  • Production recalculation
  • Report to the GSE
  • Incentive recovery

The result

01

€11,000 recovered

The GSE paid the farm €11,000 in incentives.

02

About 20,000 kWh

The production gap not counted in 2017.

03

Data aligned

The recalculated figure finally reached the GSE.

04

Ongoing monitoring

ACEPER software makes data readable even for non-experts.