The problem
This solar battery storage project was designed to improve energy independence and make better use of renewable power. The system stores excess solar energy during the day and provides dependable power when solar production is low.
With efficient equipment and smart energy management, the project helps reduce grid dependency while providing greater control over daily energy usage.
What we did
The technical manager had tried many times to fix the fault, without success. When he contacted Aceper we immediately handed the case to one of our specialist members.
- Remote reading analysis
- Specialist member
- Actual production check
- GSE data correction
- Settlement

The result
01
Over €100,000
The company received a settlement of over €100,000.
02
Over a year
The period in which production was under-recorded.
03
Specialist member
Immediate action by our network.
04
Province of Bergamo
A large member farm.
