When remote reading does not match real production

Real problems of renewable energy producers, solved by ACEPER and its specialist members: how we stepped in, which checks we carried out and what results the member achieved.

The problem

This solar battery storage project was designed to improve energy independence and make better use of renewable power. The system stores excess solar energy during the day and provides dependable power when solar production is low.

With efficient equipment and smart energy management, the project helps reduce grid dependency while providing greater control over daily energy usage.

What we did

The technical manager had tried many times to fix the fault, without success. When he contacted Aceper we immediately handed the case to one of our specialist members.

  • Remote reading analysis
  • Specialist member
  • Actual production check
  • GSE data correction
  • Settlement

The result

01

Over €100,000

The company received a settlement of over €100,000.

02

Over a year

The period in which production was under-recorded.

03

Specialist member

Immediate action by our network.

04

Province of Bergamo

A large member farm.

At a glance

Member:

ACEPER member

Year:

2026

Result:

Settlement of over €100,000

Location:

Italia