The problem
This solar battery storage project was designed to improve energy independence and make better use of renewable power. The system stores excess solar energy during the day and provides dependable power when solar production is low.
With efficient equipment and smart energy management, the project helps reduce grid dependency while providing greater control over daily energy usage.
What we did
Thanks to our software we noticed that the GSE recorded 6,900 kWh for September 2016, far too low for a plant of over 500 kWp. Comparing it with the production register showed the real figure was 69,000 kWh, ten times higher. We took action to report the anomaly.
- Monitoring software
- Production register check
- Anomaly detection
- Report to the GSE
- Incentive recovery

The result
01
Over €15,000
Our member recovered over €15,000.
02
69,000 kWh actual
Against the 6,900 kWh recorded by the GSE.
03
Over 500 kWp
The capacity of the monitored plant.
04
Anomaly reported
Prompt report to the GSE.